Planning the upgrade
The upgrade process is designed to meet the needs of multiple types of environment. Depending on the setup within your organization, a number of deployment options are available to minimize the impact on day-to-day operations.
Before you upgrade iBase, consider the following areas:
- Original system configuration and use
- Every iBase deployment is configured to match the needs of different users, so it is important that you recognize which features are used, and ensure they are configured correctly after the upgrade.
- Requirements of the system after the upgrade
- Perform an analysis of the new features of iBase to ensure that all the features relevant to your organization are set up correctly.
- Client location
- The installation process will differ depending on the number of users and the method of connection used by iBase clients when connecting to the server. For deployments in organizations that only use locally hosted databases and clients, the upgrade can take place in a single phase.
- Timescale for deployment
- Creating a realistic timescale for deployment will allow you to plan the deployment around the peak times of your system use.